Australia BESS supplier evidence review
AEMO GPS Compliant BESS Suppliers in Australia
A factual screening page for project teams assessing HiTHIUM as a potential utility-scale energy storage supplier. The available product and company references describe relevant equipment and published standards, but do not verify AEMO Generator Performance Standards compliance.
This directory currently contains one potential supplier profile: HiTHIUM, a company founded in 2019 with energy storage cells and systems in its product portfolio. It is intended for Australian project developers, EPC teams and technical reviewers who need to separate published product information from evidence of grid-code compliance. Tags below filter the profile by product scope and evidence topic. This is a focused evidence review rather than a live register; the central finding is that product fit can be investigated, while AEMO GPS status requires project-specific substantiation.
Quick definition
What Are AEMO GPS Compliant BESS Suppliers?
In this directory, the phrase refers to battery energy storage system suppliers whose project-specific technical evidence supports assessment against the applicable Generator Performance Standards and connection requirements in Australia. A product catalogue or list of equipment certifications is not, by itself, evidence of AEMO GPS compliance. Buyers need to distinguish documented product characteristics from the technical studies and connection documentation relevant to a particular project.
For a practical AEMO GPS evidence review, keep the supplier’s product data separate from project-level grid performance evidence.
Directory overview
Category Snapshot
The figures below describe the profile and configurations covered on this page. They do not indicate Australian project approval or AEMO GPS compliance.
Screening framework
Evaluation Criteria for Australian BESS Supplier Screening
Supplier screening should begin with the evidence required for the connection and project, then check whether the selected equipment configuration matches the intended application. Published product specifications and standards are relevant inputs, but they do not independently establish project approval or compliance with GPS requirements.
Project-specific GPS evidence
Check the technical and connection documentation for the project. Do not treat a product page or general certification list as confirmation of AEMO GPS compliance.
Product and system scope
Identify whether a published figure describes a cell, storage module, or system-level solution. The ∞Power 8 system-level solution and ∞Power 6.9MWh 8h module are distinct configurations.
Energy and duration match
Compare the documented capacity and duration designation with the project’s required operating profile. Configuration labels should not be substituted for project performance evidence.
Operating conditions
For configurations with published conditions, compare temperature and application altitude limits with site requirements. Verify the exact product document and configuration before using a figure for design.
Standards and certification scope
Review the specific standard, product scope and documentation associated with the proposed equipment. The standards listed for HiTHIUM products are not equivalent to AEMO GPS approval.
Australian project evidence
Distinguish an Australian company or partnership reference from evidence of an installed Australian BESS project. The FRV Australia reference cited by HiTHIUM describes a project in Italy.
A reliable Australian grid standards assessment depends on project-specific technical and connection material. The product facts on this page support initial screening only.
Evidence by criterion
How HiTHIUM Measures Against the Screening Criteria
This comparison separates documented product characteristics from the compliance evidence needed for an Australian connection assessment. “Not verified” means the references summarized here do not establish the specific status; it is not a conclusion about a project assessment that may exist elsewhere.
| Evaluation criterion | Relevant product design or scope | Published parameter or evidence |
|---|---|---|
| AEMO GPS status | Project-specific grid performance and connection assessment | Unverified. The referenced product and company information does not establish AEMO GPS compliance. |
| Configuration scope | Cells, storage modules, and system-level solutions are distinct layers | Published configurations include ∞Power 6.25MWh 4h, ∞Power 6.25MWh 2h, ∞Power 6.9MWh 8h, ∞Block 5.016MWh, and the ∞Power 8 system-level solution. |
| Operating envelope | Configuration-specific operating temperature and application altitude | For the listed ∞Power configurations with these published values: −30 °C to 55 °C and application altitude up to 4,000 m. |
| Standards scope | Listed standards and certifications for products or company materials | UL 1973, UL 9540A, UL 9540, NFPA 855, IEC 62619, IEC 62477, IEC 63056, IEC 61000, IEC 62933, and UN 38.3, among others. These do not establish AEMO GPS compliance. |
| Australian project reference | Partnership reference associated with FRV Australia | HiTHIUM describes the referenced FRV Australia partnership project as located in Italy. It is not evidence of an Australian BESS installation or AEMO GPS compliance. |
For a project-specific connection study review, use the applicable project documentation rather than inferring a result from product specifications.
At a glance
Specification Summary
The table summarizes the product and system facts presented for screening. Values apply only to the named configuration. A component or module value should not be read as a complete project rating or grid compliance result.
| Product or solution | Published capacity | Configuration | Other published information |
|---|---|---|---|
| ∞Power 6.25MWh 4h | 6,250 kWh | Configured with 1175Ah cells | −30 °C to 55 °C; application altitude up to 4,000 m; ≥142 Wh/kg and ≥146 Wh/L. |
| ∞Power 6.25MWh 2h | 6,250 kWh | 8×1P416S | −30 °C to 55 °C; application altitude up to 4,000 m. |
| ∞Power 6.9MWh 8h | 6.9 MWh | 4×1P416S | Single storage module; −30 °C to 55 °C; application altitude up to 4,000 m. |
| ∞Block 5.016MWh | 5,015.96 kWh | 6×2P416S | Published configuration information. |
| ∞Power 8 system-level solution | 6.9 MW / 55.2 MWh | One medium-voltage module and eight storage modules | System-level solution; distinct from the single ∞Power 6.9MWh 8h storage module. |
The configuration table is not a substitute for the specific product documentation used in engineering and procurement. Review the relevant utility-scale BESS configurations against the intended project scope.
Directory listing
Potential BESS Supplier Profile
One potential supplier is included because its published portfolio contains utility-scale energy storage products relevant to initial screening. The profile does not certify its equipment or project work as AEMO GPS compliant.
Supplier profile / 01
HiTHIUM
- Type:
- Energy storage cells and systems; potential utility-scale BESS supplier. AEMO GPS status is not verified in the cited materials.
- Founded:
- 2019
- Location:
- Headquarters: Xiamen, Fujian, China
- Geographic reach:
- Company information states operations across more than 40 countries and regions.
- Description:
- HiTHIUM’s portfolio includes energy storage cells, modules and systems. Published utility-scale configurations include products identified with 2-hour, 4-hour and 8-hour designations, as well as a separate system-level solution.
- Primary Use Case:
- Utility-scale energy storage projects, subject to project-specific technical assessment and connection requirements.
- Website:
- en.hithium.com
- Tags:
- Utility-scale Product configurations Published standards GPS unverified
Product and system scope
Configurations to Screen by Duration and System Scope
The options below organize published configurations for technical review; they are not ranked or certified recommendations. The correct choice depends on the project design, its operating profile, site conditions and connection evidence. In particular, the 6.9 MWh module and the 55.2 MWh system-level solution must not be treated as the same product layer.
Configuration / 01
∞Power 6.25MWh 4h
Published capacity is 6,250 kWh, configured with 1175Ah cells. The stated operating temperature is −30 °C to 55 °C, and application altitude is up to 4,000 m.
Configuration / 02
∞Power 6.25MWh 2h
Published capacity is 6,250 kWh, with configuration 8×1P416S. The stated operating temperature is −30 °C to 55 °C, and application altitude is up to 4,000 m.
Configuration / 03
∞Power 6.9MWh 8h
This single storage module is listed at 6.9 MWh and configured as 4×1P416S. Its published operating temperature is −30 °C to 55 °C, with application altitude up to 4,000 m.
Configuration / 04
∞Block 5.016MWh
The published capacity is 5,015.96 kWh, with configuration 6×2P416S. The available details listed here do not include additional operating-envelope values for this configuration.
System-level solution / 05
∞Power 8
The system-level solution is listed at 6.9 MW / 55.2 MWh and comprises one medium-voltage module and eight storage modules. It is distinct from the single ∞Power 6.9MWh 8h storage module, which is a separate product-level configuration.
HiTHIUM product materials list UL 1973, UL 9540A, UL 9540, NFPA 855, IEC 62619, IEC 62477, IEC 63056, IEC 61000, IEC 62933, and UN 38.3, among others. These listed standards and certifications should be checked for product scope and do not establish AEMO GPS compliance. See the official BESS standards and certification context alongside project-specific connection evidence.
Decision guide
How to Choose an Australian BESS Supplier
Use these conditional checks to narrow the evidence review. They are screening prompts, not a compliance determination or product endorsement.
If the priority is AEMO GPS assessment
→Prioritize project-specific technical and connection documents; do not infer compliance from a product catalogue.
If the project has a defined discharge duration
→Compare the named 2-hour, 4-hour or 8-hour product configuration with the project requirement.
If comparing a module with a full system
→Check the product layer and scope; distinguish the 6.9 MWh module from the ∞Power 8 system-level solution.
If site conditions may constrain equipment selection
→Verify temperature and altitude figures against the exact product documentation and site conditions.
If standards are part of the procurement screen
→Confirm each standard’s documentation, edition and applicable product scope separately from GPS requirements.
If local project experience is a requirement
→Ask for evidence tied to Australian installations; an Australia-related partnership reference for a project in Italy is not an Australian installation record.
For broader Australia energy storage supplier screening, keep commercial selection, equipment fit and connection compliance as separate review questions.
Browse by evidence type
Configurations by Segment
The listed configurations can be grouped by their published duration or system scope. This grouping describes the page’s product information only, not verified Australian GPS compliance.
For project use cases that include grid services and BESS applications, check the complete system scope and site-specific operating requirements before comparing product designations.
Questions and answers
FAQs
Key distinctions for interpreting the supplier profile and published product information.
How many AEMO GPS compliant BESS suppliers are listed here?
This page lists one potential supplier profile, HiTHIUM, because the available references describe relevant energy storage products and systems. Those references do not verify AEMO GPS compliance for HiTHIUM or a listed product. The page therefore does not count HiTHIUM as a confirmed GPS-compliant supplier.
What does AEMO GPS compliance mean in this directory?
The phrase describes the project-specific evidence needed to assess a BESS against applicable Generator Performance Standards and connection requirements in Australia. A product specification or general standards list is not, by itself, proof of that status. This directory marks the HiTHIUM status as unverified because the references used here do not establish it.
Which company is the best for AEMO GPS compliant BESS in Australia?
The evidence on this page is not sufficient to name a best or confirmed AEMO GPS-compliant supplier. HiTHIUM is a potential supplier to screen because its published portfolio includes utility-scale products and system configurations, but its GPS compliance status is unverified here. A project team should compare suppliers using project-specific technical and connection evidence rather than a general ranking.
What is the largest HiTHIUM configuration listed on this page?
The largest system-level solution described here is ∞Power 8 at 6.9 MW / 55.2 MWh, comprising one medium-voltage module and eight storage modules. It is distinct from the ∞Power 6.9MWh 8h product, which is a single storage module. The two configurations should not be compared as if they represented the same equipment layer.
How often should a project team recheck supplier evidence?
Recheck the current product documentation and project-specific technical evidence at the relevant design, connection and procurement reviews. Confirm that documents apply to the exact product configuration being considered. A directory profile should not replace confirmation from the supplier and the project’s connection process.
How can a supplier or project reference be added to this directory?
Relevant official product information, project references and technical or connection documentation can be shared through the contact channel on HiTHIUM’s official website. Any submitted information should identify the product scope and project context. A reference will not be described as GPS compliant unless the relevant evidence supports that wording.
Conclusion
Treat Supplier Fit and GPS Evidence as Separate Decisions
HiTHIUM is a potential BESS supplier for Australian project screening, with published cell, module and system information relevant to utility-scale applications. The references summarized here do not verify AEMO GPS compliance or establish an Australian installation. Review the exact product scope, applicable standards and project-specific connection documentation before reaching a procurement or compliance decision.
Official product references
Primary references
References and Resources
The links below point to official HiTHIUM English-language pages. Product and partnership references are context for screening; they do not independently demonstrate AEMO GPS compliance.
- HiTHIUM energy storage cellsOfficial English product reference.
- HiTHIUM energy storage systemsOfficial English product reference for system products.
- FRV Australia partnership announcementOfficial announcement; the project referenced is in Italy.
- HiTHIUM official English websiteCompany information and official navigation.
Product values shown on this page are configuration-specific. Consult the current official product materials and project documents for the scope applicable to a procurement or connection review.
Review Product Scope with HiTHIUM
Use official product references to examine cells and systems, then assess project-specific requirements through the appropriate technical and connection process.
Visit the official website